ML One Solutions LLC
Manufacturing of downhole equipment for multilateral completion and sidetracking. Providing engineering support.
ML One Solutions LLC
Manufacturing of downhole equipment for multilateral completion and sidetracking. Providing engineering support.
Upstream. Multilateral well construction, sidetracking
One of the key features of ML One is a flexible approach and an ability to adapt to customer specifications. Due to advanced R&D and manufacturing facilities, the load out date is 60 calendar days once ordered.
MENA region
Multilateral completion and sidetracking technologies are applicable for the construction of the production and injection wells. Promising uses are geothermal wells and SAGD (Steam Assisted Gravity Drainage).
ISO certificated management systems:
· ISO 9001:2015: Certificate of conformity № RU.MSK.019.020.SM.14852 from 29.01.2021 attests that ML One quality management system complies with • ISO 9001:2015.
· ISO 14001:2015: Certificate of conformity № СДС.ФР.СМ.010032.21 from 20.08.2021 attests that ML One environmental management system complies with ISO 14001:2015.
· SO 45001:2018: Certificate of conformity № СДС.ФР.СМ.010033.21 from 20.08.2021 attests that ML One occupational health and safety management system complies with ISO 45001:2018.
Membership:
· DUNS #522404299 from 16.03.2021.
· Innovation Center Skolkovo. Registration number #1121906 from 21.08.2017.
Special features:
· Patented technological solutions;
· Quality management system complies with ISO 9001;
· Possibility to integrate any type of completion technologies in well design (MSF, ICD, smart completion, etc.);
· Reduce CAPEX of well construction and surface infrastructure through replication of MLT.
Competitive advantages:
· Comply with Level 1-5 of the international TAML classification (Technology Advancement of Multilaterals);
· Applicable for different casing and open hole sizes: from 5 ¾’’ up to 9 5/8’’;
· Flexibility - compatibility with customer’s equipment;
· Total cost (final cost depends on TAML level and specification);
· Load out date (60 calendar days).