INSTALLATION FOR COGENERATION OF SOLID DOMESTIC WASTE WITH CAPACITY OF 24-26 TONS PER DAY
INSTALLATION FOR COGENERATION OF SOLID DOMESTIC WASTE WITH CAPACITY OF 24-26 TONS PER DAY
The technology is based on the concept of fast high temperature pyrolysis decomposition of wastes. The proposed system is designed to be very tolerant to the composition ratio of the supplied mix and its humidity levels and may be designed to handle any kind of sizes of the individual pieces. The system has mixing and fuel buffers, ensuring uninterrupted operation and is designed to work automatically with minimal human attendance. The highly automated managements system of the installation allows operation by one operator with minimal training. The management control system does not require constant supervision. Feeding of the waste and occasional verification checks and standard set of reactions to sounded alarms is usually all is needed from the operator during the normal operation mode. The computerized management system allows a higher-level trained operator to change major parameters to optimize even further the performance of the system and fine-tune it to local conditions. The installation should not in general handle metal, stone, concrete and glass as they can damage the processing system and increase the energy self-consumption. Small pieces of them can be accepted, pending that a more heavy duty shredding and extraction devices are installed. Syringes needles and alike are accepted by any of the equipment without modifications. For the removal of steel cords from tires we offer additional equipment. Occasional syringes needles, small wires, metal buttons and small nails and alike are accepted by any of the equipment without modifications. For the removal of steel cords from tires we offer additional equipment. Occasional syringes needles, small wires, metal buttons and small nails and alike are accepted by any of the equipment without modifications. Additional intake feeders for handling medical or other bio-hazardous waste can also be installed (conformity with EU directive 2000/6). PVC can be accepted if not exceeding 2-3% of the daily volume. Separate addition for specifically handling PVC can be integrated as well. The installation is autonomous. After initial start-up - usually with a diesel burner - and reaching operating temperature, some of the exhaust gases /25-30%/ are returned to the reactor to maintain the process. The offered installations are suitable for any places or businesses producing unusable otherwise waste (and/or paying significant sums for its disposal) or handling waste in sustainable way, or for energy generation based business, in places where preferential energy tariffs are available and guaranteed by the local legislation. The installations are stand-alone structures and can be used in parallel to each other in any combination. The mobile version is a perfect solution for temporary used places (mass happenings, refugee camps, peace-keeping and other military temporary deployments, remote areas, small islands, etc.).
Name and type of offer
Our company “Vedas-X” Ltd is a trading company and would like to declare our interest for supply of installations for utilization of domestic waste and converting them into flammable gas, electrical and thermal energy. We also introduce ourselves as a Supplier\Seller of the above mentioned installations. Address of the company: Bulgaria, Varna
Your company's business
Trading company
The conditions of implementation of the proposal
: We offer the following volume based systems: - 0.1 MT/hour (medical and other bio-hazardous materials option only) - 0.25 MT/hour - 0.5 MT/hour - 1 MT/hour - 2.5 MT/hour Larger volume installations – up to 5 MT/h, can be designed and produced. They however will not be based on a container or modular principle and have to be assembled on-site as permanent structures. Price of the installation for cogeneration of SDW with capacity of 24-27 t per day - €2 000 000
Terms of payment
Advance payment -30% Interim payments 8х6% /monthly/ – 48% Payment before loading – 12% Final payment (after 72h testing period) – 10% Terms of delivery: - design – 1 month - manufacturing/ production - 8 months - installation, commissioning and training – 3 months
Delivery of the installation
ex works, Bulgaria Remark: For more information please see the attached short representation of the product.
Contact information is available only for registered users